Sap Scheduling Agreement Delete

Hello, appointments and orders cannot be removed from SAP. Rows can be blocked as described above, but the only way to remove them from the live database is to archive them. Greetings, SOP57 I just need this confirmation. I have a delivery plan for which we have to remove certain positions. In the positions, there are qty variances in GR/IR/Target quantity. Changes have been made to Target and GR qty or Target and IR qty and still receive the error when deleting. You need to check whether or not there have been open deliveries for positions. If necessary, close the GR process or remove these items from the delivery. Then you can perform the process of erasing scheduling positions. Delivery plan has been successfully registered Hello, calendar contracts and orders cannot be withdrawn from SAP.

Rows can be blocked as described above, but the only way to remove them from the live database is to archive them. Looks,SOP57 As a delivery plan is a legally valid document, the system prompts you to enter the validity dates: There are two ways to begin the process of creating a delivery plan: Press the key to display the details of the head in the delivery plan: Use the button to view the details of the head STANDARD SAP type of delivery plans: Please note that each field with a “tic sign” signifies its task and the SAP system needs to be replenished. To choose a necessary delivery plan, press F4 in the appropriate field and display all loVs (list of values) with the available calendar types. List of delivery plan types Hello, How can I delete a delivery plan (ME31L) and a delivery plan (ME38) Thank you, Marleen This is because delivery plans require that the classification must be completed. Choose the appropriate position and press the button in the position area of the delivery plan: Click the Details button for a very good location item in this forum about the delivery plan Framework contracts play an important role in almost any business process. Customers and sellers accept that the goods will be made available under certain conditions and within a specified period. Framework contracts optimize business processes for both partners in a business relationship. Press the button to find out the current status of the delivery plan: Delivery plan status When developing a delivery plan, the following master data is integrated. Press F3 or return to the main screen…